One of the beautiful, massive, curved steel beams that make up the striking architectural design on the outside of the student union is in place, with delivery of the steel that will form the three additional ribs of the union’s exoskeleton arriving over the next few weeks from Lancaster, Pennsylvania. Right now constructions crews are finishing section A of the union, the southwest section of the four-story main building. Next in the construction schedule will be erecting the steel for section B, one of the two sections that will form the front of the union overlooking the quad.